Enter a job title or keyword

Site Quality Manager (CWI) Data Center Construction

Mullins Mechanical


Job Location:

Bremen, OH - USA

Monthly Salary: Not provided by the employer
Posted: 10 June 2026 (30+ days ago)
Application Deadline: 7 September 2026
Vacancies: 1 Vacancy

Job Summary

About You
Are you knowledgeable about quality and safety regulations in construction environmentsDo you engage and advise job site leadership regarding quality programs and best practicesIf this sounds like you then you should mull over a career with Mullins Mechanical.

We are looking for an experienced self-motivatedSite Quality Managerto join our growing teamin position will involve working outside in extreme weather conditions exposure to loud noises and abnormal odors confined space work and working in areas with overhead activities.


Our Commitment
Our commitment to excellence in safety quality customer service and professionalism has earned us a top-notch reputation in the industry. Built on client relationships our project teams are committed to providing services with integrity that will uphold our prestige within the industry.

We realize that our greatest asset is our people. We offer competitive compensation and benefits packages that include medical dental vision life disability paid holidays paid vacation and 401K.

Responsibilities

  • Weld Map Isometric drawings using computer software programs.
  • Enter welding and inspection information into the tracking tool.
  • Assistwith pressure testing plans and functions.
  • Review and File NDE/NDT Reports
  • Work with NDE personnel for planning and execution of work
  • Assemble and review project documentation packages.
  • Perform and document inspections based on drawings specifications and procedures todeterminecompliance.
  • Test welders and perform weld inspections undervariescodes.
  • Review client requirements and ensure specifications are met.
  • Follow Project Quality Assurance Plans.
  • Follow inspection and test plans (I&TPs)
  • Committed to Mullins core values and safety policies.
  • Plan and execute Root Cause Analysis and Corrective Action Reports


Qualifications

  • 7 years of experience as a Quality Manager
  • Extensive knowledge of codes and standards (ASME AWS ACI AISC NACE)
  • Experience with the verification of mechanical equipment alignment
  • Have a current AWS CWI and/or ASNT VT II and/ or API 510/570
  • Extensive knowledge of NDT methods (UT MT PT RT)
  • Understanding of ASTM standards and materials
  • Efficient in Microsoft Excel Word and/ or Project management software (Procore)
  • Ability to communicate effectively with co-workers.
  • Excellent interpersonal written and verbal communication skills
  • High levelof organizational skills
  • Extensive knowledge of reading and understanding drawings
  • Self-motivated with the drive to learn and grow.


JoinUs
Mullins Mechanical ranked #1475 on the 2023 Inc. 5000 list andwereproud to be one of the fastest growing privately held companies in self-performing specialty contractor specializing in design-buildapplications HVAC systems plumbing process piping systems boiler and chiller systems equipment installation and rigging plant relocation and maintenance and metal fabrication. Our projects are often in industrial and manufacturing environments such as manufacturing facilities automotive plants chemical plants distribution centers warehouses and other large commercial facilities.

Join Us
Mullins Mechanical ranked #243 on the 2024 ENR Top Specialty Contractors list #48 in the Nation and #5 in the Southeast among Firms in Mechanical. Were proud to be one of the fastest growing privately held companies in America. Were a self-performing specialty contractor specializing in design-build applications HVAC systems plumbing process piping systems boiler and chiller systems equipment installation and rigging plant relocation and maintenance fire protection and metal fabrication. Our projects are often in industrial and heavy commercial environments such as manufacturing facilities automotive plants chemical plants distribution centers warehouses data centers and other large facilities.


Required Experience:

Manager


About Company

Company Logo

Join Us Mullins Mechanical ranked #243 on the 2024 ENR Top Specialty Contractors list, #48 in the Nation and #5 in the Southeast among Firms in Mechanical. We’re proud to be one of the fastest growing privately held companies in America. We’re a self-performing specialty contractor sp ... View more

View Profile View Profile