Enter a job title or keyword

MEP Commissioning Engineer Data Center Construction

Sundt Construction


Job Location:

Maxwell, CA - USA

Monthly Salary: Not provided by the employer
Posted: 31 July 2026 (30+ days ago)
Application Deadline: 28 October 2026
Vacancies: 1 Vacancy

Job Summary

Description

Job Summary

Directs and coordinates program activities designed to provide subcontractors management and customers with setup and commissioning knowledge to ensure effective and economical engineering support. Analyzes contractual commitments customer specifications design changes and other data to plan and develop commissioning & start-up program activities from conceptual stage through life-cycle of product. Develops and implements program activities coordinates efforts of subcontractors production departments and field service personnel and resolves problems in area of logistics to ensure meeting of contractual commitments. Compiles data on standardization and interchangeability of parts to expedite commissioning & start-up activities.
Determines logistic support sequences and time phasing problems arising from location of operational area and other factors.

Key Responsibilities

of resolving escalated issues arising from operations and requiring coordination with other departments.
commissioning coordination meetings as needed with the owner project management contractor and other commissioning team members as defined in the commissioning plan.
all construction engineering projects initiatives and processes are in conformance with organizations established policies and objectives.
with commissioning & start-up engineering as well as related systems.
ways to reduce operating and maintenance costs improve the comfort of a buildings occupants and extend the life of the equipment.
refine and augment Sundts commissioning procedures and documentation to enhance the commissioning team processes.
project specific pre-start start-up and test-adjust-balance and commissioning fieldwork.
the latest industry trends and share knowledge with commissioning team members.
input to strategic decisions that affect commissioning and start-up engineering support.
the operation of the systems in the commissioning scope including establishing acceptance criteria obtaining completed reports from the installing vendor and direct performing testing and verification.

Minimum Job Requirements

Engineering degree or equivalent work experience required.
designation through the NCEES or PE license preferred.
have demonstrated proficiency for all the responsibilities of a Commissioning Engineer; 5 years of experience in the commissioning field including performance contracting requirements preferred.
in SCA PECI and/or ASHRAE commissioning procedures preferred.
use of all Microsoft Office Suite programs.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

stoop kneel or bend on an occasional basis
be able to comply with all safety standards and procedures
to use hands to grasp lift handle carry or feel objects on a frequent basis
interact with people and technology frequently during a shift/work day
lift push or pull objects up to 501bs on an occasional basis.
sit stand or walk short distances for up to the entire duration of a shift/work day.
use telephone computer system email and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle operating equipment operating machinery or power tools repairing/maintaining the operation of any vehicle/equipment the handling/disposal/transport of hazardous materials or the handling/treatment/disposal of potentially flammable/combustible materials.




Required Experience:

IC


About Company

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate ab ... View more

View Profile View Profile