Enter a job title or keyword

HVAC Superintendent- (Onsite-Pampa TexasData Center Construction)

Mullins Mechanical


Job Location:

Amarillo, TX - USA

Monthly Salary: Not provided by the employer
Posted: 15 October 2026 (9 days ago)
Application Deadline: 12 January 2027
Vacancies: 1 Vacancy

Job Summary

HVAC Superintendent (Onsite Pampa Texas Data Center)

Mullins Mechanicalis a leader in industrial and large commercial mechanical plumbing HVAC construction projects are often in the industrial and manufacturing environments such as manufacturing facilities automotive plants chemical plants distribution centers warehouses and other large commercial facilities. We are a self-performing specialty contractor specializing in design-build applications HVAC systems plumbing process piping systems boiler and chiller systems equipment installation and rigging plant relocation and maintenance and metal fabrication.

Responsibilities:

  • Report directly to the Field Operations Director and provide regular updates regarding field commissioning progress manpower startup activities project readiness and field challenges.
  • Execute the commissioning plan developed by the Commissioning Project Manager.
  • Direct and supervise all daily field commissioning activities on assigned projects.
  • Lead commissioning technicians startup personnel subcontractors manufacturers and specialty vendors throughout commissioning activities.
  • Coordinate daily manpower work assignments and commissioning priorities.
  • Develop and maintain daily and weekly startup schedules that align with project milestones.
  • Coordinate equipment startup with manufacturers controls contractors TAB agencies electrical contractors and subcontractors.
  • Verify that systems are complete operational and ready for startup prior to commissioning activities.
  • Supervise startup and functional performance testing of HVAC plumbing process piping mechanical equipment controls and integrated building systems.
  • Coordinate system flushing pressure testing balancing controls integration and equipment verification.
  • Identify commissioning deficiencies troubleshoot system issues coordinate corrective actions and verify successful resolution.
  • Maintain field commissioning punch lists deficiency logs startup records and testing documentation.
  • Coordinate commissioning activities with Project Superintendents Project Managers Project Engineers Quality Safety and field operations personnel.
  • Ensure commissioning activities comply with contract requirements project specifications manufacturer recommendations and company quality standards.
  • Conduct startup safety meetings and ensure compliance with Lockout/Tagout procedures and other commissioning safety requirements.
  • Support owner demonstrations training sessions and final system turnover.
  • Submit complete and accurate field commissioning documentation to the Commissioning Project Manager for project closeout.
  • Mentor field personnel on commissioning procedures startup best practices and safe execution of commissioning activities.
  • Additional responsibilities may be assigned as needed.

Qualifications:

  • High school diploma or GED required; technical degree apprenticeship or trade certification preferred.
  • Minimum of ten (10) years of experience in mechanical construction HVAC plumbing process piping controls startup or commissioning.
  • Minimum of five (5) years of supervisory experience leading field operations on large-scale construction projects.
  • Extensive experience with equipment startup testing balancing controls integration and system commissioning.
  • Thorough understanding of construction sequencing field operations startup procedures and integrated building systems.
  • Ability to read and interpret construction drawings specifications P&IDs equipment submittals control diagrams and sequences of operation.
  • Strong troubleshooting leadership organizational and communication skills.
  • Experience coordinating subcontractors equipment manufacturers and specialty vendors during commissioning activities.
  • Proficiency with Microsoft Office Suite Procore Bluebeam and construction management software.
  • OSHA 30 certification required or ability to obtain.
  • Commissioning certification (CxA CCP CBCP QCxP or equivalent) preferred.
  • Ability to travel extensively to assigned project sites.

Essential Job Functions:

Work at heights including ladders scaffolds lifts platforms mezzanines and elevated structures up to and exceeding 100 feet.

  • Work around moving equipment such as forklifts cranes aerial lifts skid steers and other heavy machinery.
  • Standing and walking for extended periods
  • Perform physically demanding tasks including lifting carrying pushing pulling bending kneeling crawling climbing and reaching.
  • Maintain situational awareness in dynamic noisy and highhazard environments.
  • Use required PPE including hard hats safety glasses gloves hearing protection fall protection and respiratory protection when applicable.
  • Work in confined or restricted spaces as required by project scope.
  • Operate or use hand and power tools safely and effectively.
  • Follow safety protocols lockout/tagout procedures and hazardcontrol measures.
  • Communicate effectively with team members supervisors and equipment operators using verbal instructions radios and hand signals.

Physical Demands:

Lifting and carrying materials and equipment up to 50 lbs frequently

  • Working on uneven terrain including dirt gravel mud rebar mats and unfinished surfaces.
  • Climbing ladders and stairs repeatedly throughout the workday.
  • Bending stooping kneeling and crouching to perform installation repair or inspection tasks.
  • Repetitive motions including gripping twisting hammering and tool operation.
  • Full use of hands arms legs and balance to safely navigate job sites and perform tasks.
  • Visual and auditory acuity sufficient to identify hazards read instructions and communicate in highnoise environments.

Environmental Conditions:

  • Yearround outdoor environments including extreme heat cold rain snow and wind.
  • Industrial indoor environments such as data centers manufacturing floors mechanical rooms and utility spaces.
  • Highnoise areas requiring hearing protection.
  • Dusty dirty or fumeproducing environments depending on project scope.
  • Tight or congested workspaces with multiple trades working simultaneously.
  • Varying lighting conditions including lowlight or tasklightonly areas.

Cognitive & SafetyCritical Requirements

Maintain alertness and awareness for long periods.

  • Recognize and avoid hazards including fall hazards electrical hazards pinch points and equipment movement.
  • Follow written and verbal instructions accurately.
  • Make quick safe decisions in changing conditions.
  • Work independently or as part of a team depending on task needs.

Equal Employment Opportunity: Mullin Mechanical is an Equal Opportunity Employer and does not discriminate based on race color religion sex national origin age disability veteran status or any other protected characteristic.

Disclaimer: This job description is not intended to be an exhaustive list of all duties responsibilities or qualifications associated with the position. Duties and responsibilities may change at any time with or without notice.

Join Us
Mullins Mechanical ranked #243 on the 2024 ENR Top Specialty Contractors list #48 in the Nation and #5 in the Southeast among Firms in Mechanical. Were proud to be one of the fastest growing privately held companies in America. Were a self-performing specialty contractor specializing in design-build applications HVAC systems plumbing process piping systems boiler and chiller systems equipment installation and rigging plant relocation and maintenance fire protection and metal fabrication. Our projects are often in industrial and heavy commercial environments such as manufacturing facilities automotive plants chemical plants distribution centers warehouses data centers and other large facilities.


About Company

Company Logo

Join Us Mullins Mechanical ranked #243 on the 2024 ENR Top Specialty Contractors list, #48 in the Nation and #5 in the Southeast among Firms in Mechanical. We’re proud to be one of the fastest growing privately held companies in America. We’re a self-performing specialty contractor sp ... View more

View Profile View Profile