Enter a job title or keyword

Data Center Construction Cost Estimator (Nashville, TN)

Oracle


Job Location:

Nashville, IN - USA

Yearly Salary: USD 67900 - 166100
Posted: 11 September 2026 (3 days ago)
Application Deadline: 9 December 2026
Vacancies: 1 Vacancy

Job Summary

Description

The Global Program Controls organization provides governance reporting controls processes cost management support and portfolio visibility to help Oracle Cloud Infrastructure deliver global data center programs with greater consistency transparency and execution discipline.

Oracle is seeking a Construction Cost Estimator (IC3) to support data center development build-out and infrastructure delivery across multiple regions. This is a hands-on estimating role responsible for preparing conceptual budgetary and detailed construction estimates across civil structural architectural mechanical electrical plumbing fire protection controls low-voltage security network and site-infrastructure scopes.

The Construction Cost Estimator will develop assigned estimates and work packages using established methods and governance partnering with senior estimators Design Engineering Construction Project Controls Procurement Finance and external cost partners. The role translates drawings models system information market pricing and construction assumptions into traceable quantity takeoffs transparent cost models Basis of Estimate documentation and decision-support materials.

Estimate Development and Quantity Takeoffs

  • Develop construction cost estimates for assigned data center projects and work packages at conceptual design-development procurement and detailed-design stages.

  • Prepare and validate quantity takeoffs from engineering drawings BIM models P&IDs one-line diagrams equipment lists schedules specifications design narratives and scope documents.

  • Analyze labor material equipment subcontract general conditions indirect costs escalation allowances and contingency to produce accurate and transparent estimate build-ups.

  • Structure estimates using the approved cost breakdown structure (CBS) and work breakdown structure (WBS) maintaining traceability from scope and quantities to budget lines and work packages.

  • Incorporate labor productivity crew composition construction sequencing schedule constraints site logistics regional market conditions and other project-specific execution factors.

  • Collaborate with Design and Engineering teams to validate scope system assumptions quantities equipment requirements specifications and interfaces between disciplines.

  • Prepare Basis of Estimate packages documenting scope design basis inclusions exclusions assumptions allowances risks estimate methodology source data and qualifications.

  • Identify cost risks scope gaps quantity concerns constructability issues and value-engineering opportunities and communicate them to senior estimators and project stakeholders.

Pricing Review and Commercial Support

  • Review contractor subcontractor vendor consultant and colocation-provider proposals for completeness scope alignment quantities pricing accuracy exclusions qualifications and risk considerations.

  • Prepare bid-leveling proposal-normalization scope-reconciliation and pricing-comparison analyses using a consistent CBS/WBS and estimate basis.

  • Support preparation of procurement and bid packages cost baselines and budget allocations for major equipment bulk materials construction services and assigned work packages.

  • Contribute to should-cost analyses and independent cost checks using internal models historical data benchmarks regional labor assumptions and current market information.

  • Support cost-reconciliation and negotiation meetings by preparing analyses documenting clarifications and agreed assumptions tracking open items and escalating material issues to senior estimating or commercial leads.

  • Assist with change-order and design-change evaluations by validating quantities pricing labor assumptions markups schedule effects and alignment with the approved scope and budget.

Project Controls and Reporting Support

  • Support development and maintenance of project cost baselines budget allocations cost plans and estimate handoffs to Project Controls and Delivery teams.

  • Provide estimate-to-actual comparisons cost variance analyses trend information forecast inputs and change-impact assessments during project execution.

  • Maintain clear links between estimates approved budgets procurement packages commitments forecasts and changes so cost movements can be explained and audited.

  • Prepare estimate summaries cost reports dashboards review materials and presentation content for Finance project teams and leadership review.

  • Present routine estimate findings assumptions cost drivers and risks to project stakeholders and support senior estimators during complex or executive-level reviews.

Standards Data and Collaboration

  • Develop and maintain cost databases unit rates benchmarking tools productivity assumptions and historical cost records for data center systems and construction scopes.

  • Compare estimates with awarded pricing actual costs contractor submissions and change orders to improve future estimate quality and benchmark reliability.

  • Apply Oracle estimating standards CBS/WBS requirements documentation expectations review procedures and applicable industry best practices.

  • Validate estimate inputs calculations source references version control and supporting documentation before estimates are submitted for review.

  • Collaborate across Design Engineering Construction Procurement Commercial Finance Project Controls Scheduling Operations contractors consultants and colocation providers.

  • Contribute practical improvements to estimating templates tools review checklists cost reporting and recurring team processes.



Responsibilities

Required Qualifications

  • 5 years of experience in construction estimating cost management quantity surveying preconstruction project controls or a related capital-project delivery role.

  • Experience preparing conceptual budgetary quantity-based or detailed estimates for multi-discipline construction infrastructure industrial or mission-critical projects.

  • Demonstrated ability to perform quantity takeoffs and interpret drawings models P&IDs one-lines equipment schedules specifications design narratives and scope documents.

  • Working knowledge of labor productivity material and equipment pricing subcontract costs general conditions indirect costs escalation contingency and contractor markups.

  • Experience reviewing bids or proposals reconciling scope validating quantities preparing comparisons and identifying cost or commercial risks.

  • Strong analytical and spreadsheet-based cost-modeling skills with attention to accuracy traceability documentation and version control.

  • Clear written and verbal communication skills and the ability to work independently on assigned deliverables while seeking guidance on complex issues.

This is a full-time onsite role in Nashville TN.

Preferred Qualifications

  • Experience supporting hyperscale data centers colocation facilities mission-critical infrastructure semiconductor advanced manufacturing or other complex technical projects.

  • Bachelors degree in Construction Management Quantity Surveying Engineering Architecture or a related discipline or equivalent practical experience.

  • Experience with an owners organization cost consultancy quantity surveying firm general contractor specialty contractor or design-build organization.

  • Familiarity with estimating software BIM-based quantity workflows cost-management systems reporting platforms or data-visualization tools.

  • Experience supporting projects across multiple regions construction markets contractors vendors or delivery models.

Success Measures

  • Assigned estimates and takeoffs are accurate complete transparent and delivered on schedule.

  • Estimate assumptions quantities pricing sources risks and qualifications are documented clearly and can be traced through the CBS/WBS.

  • Bid and proposal reviews identify scope gaps pricing anomalies and commercial risks early enough to support corrective action.

  • Estimate-to-actual comparisons cost data and benchmarks become more reliable and useful over time.

  • Project teams Project Controls Finance and senior estimators receive timely decision-ready cost information with minimal rework.

Core Deliverables

  • Conceptual budgetary and detailed construction estimates aligned to the CBS/WBS with supporting Basis of Estimate packages.

  • Quantity takeoffs cost build-ups labor and productivity analyses unit-rate models and estimate assumptions logs.

  • Bid-leveling sheets proposal reviews scope-reconciliation analyses pricing comparisons and commercial clarification logs.

  • Cost-risk summaries value-engineering analyses change-order evaluations estimate-to-actual comparisons and forecast inputs.

  • Cost databases benchmark updates estimate summaries dashboards Finance review materials and project decision-support content.

Role Expectations

This is a hands-on IC3 role for an estimator who independently develops assigned construction estimates and work packages prepares accurate takeoffs and transparent cost models and supports senior estimators Finance Project Controls Procurement and Delivery with timely analysis. The role exercises sound judgment within established methods communicates risks clearly and escalates the most complex scope and commercial decisions.



Qualifications
Disclaimer:

Certain U.S. based or U.S. customer or client-facing roles may be required to comply with applicable requirements such as immunization/occupational health mandates and/or drug testing requirements.

Range and benefit information provided in this posting are specific to the stated locations only

US: Hiring Range in USD from: $67900 to $166100 per annum. May be eligible for bonus and equity.


Oracle maintains broad salary ranges for its roles in order to account for variations in knowledge skills experience market conditions and locations as well as reflect Oracles differing products industries and lines of business.
Candidates are typically placed into the range based on the preceding factors as well as internal peer equity.

Oracle US offers a comprehensive benefits package which includes the following:
1. Medical dental and vision insurance including expert medical opinion
2. Short term disability and long term disability
3. Life insurance and AD&D
4. Supplemental life insurance (Employee/Spouse/Child)
5. Health care and dependent care Flexible Spending Accounts
6. Pre-tax commuter and parking benefits
7. 401(k) Savings and Investment Plan with company match
8. Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.
9. 11 paid holidays
10. Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.
11. Paid parental leave
12. Adoption assistance
13. Employee Stock Purchase Plan
14. Financial planning and group legal
15. Voluntary benefits including auto homeowner and pet insurance

The role will generally accept applications for at least three calendar days from the posting date or as long as the job remains posted.

Career Level - IC3





About Company

Company Logo

As a world leader in cloud solutions, Oracle uses tomorrow’s technology to tackle today’s challenges. We’ve partnered with industry-leaders in almost every sector—and continue to thrive after 40+ years of change by operating with integrity. We know that true innovation starts when eve ... View more

View Profile View Profile