Enter a job title or keyword

Construction Scheduling Manager


Job Location:

Mount Juliet, TN - USA

Monthly Salary: Not provided by the employer
Posted: 29 May 2026 (30+ days ago)
Application Deadline: 26 August 2026
Vacancies: 1 Vacancy
The job posting is outdated and position may be filled

Job Summary

Job Summary/Description

Jones Bros. Contractors LLC (Jones Bros.) is seeking an experienced and highly motivated Construction Scheduling Manager to support the planning coordination and execution of both Alternative Delivery and traditional Design-Bid-Build (DBB) heavy civil projects. The Construction Scheduling Manager will develop maintain and analyze CPM schedules throughout the project lifecycle-from early pursuit and preconstruction phases through closeout-ensuring accurate sequencing resource planning and risk management.

This role works closely with estimating project management engineering design partners and field leadership to support diverse delivery methods while maintaining production-focused schedules for roadway bridge highway utility and other heavy civil infrastructure projects.

Duties & Responsibilities

  • Develop detailed CPM schedules for both Alternative Delivery (Design-Build Progressive DB CM/GC) and traditional DBB projects including earthwork utilities paving bridges traffic control staging permitting blasting etc.
  • Support preconstruction and pursuit efforts with conceptual proposal and baseline schedules that incorporate design progression production rates resource allocation and risk mitigation strategies.
  • Facilitate schedule coordination meetings with project teams design partners subcontractors and field personnel.
  • Maintain update and analyze schedules weekly and monthly; identify variances risks or sequencing conflicts; recommend corrective actions.
  • Incorporate design changes clarifications utility coordination permitting requirements and environmental constraints into the schedule.
  • Prepare milestone charts schedule narratives dashboards manpower/resource histograms and executive-level reports.
  • Manage corporate asphalt paving equipment and staffing schedules.
  • Conduct Time Impact Analyses (TIA) or schedule-driven evaluations to support change orders delay claims and contract modifications.
  • Sequence major civil operations including earthwork rock excavation embankments stormwater and utility installations bridge substructures and superstructures and roadway surfacing.
  • Develop traffic control and phasing schedules aligned with DOT requirements lane closures and seasonal/weather restrictions.
  • Provide training and technical support to project teams on CPM scheduling Primavera P6 usage and scheduling best practices across multiple delivery methods.
  • Ensure compliance with company scheduling standards DOT/owner requirements and Alternative Delivery contracting guidelines.
  • Participate in owner meetings design coordination sessions and partnering workshops as needed.

Required Skills & Abilities

  • Must be able to work onsite at our Mt. Juliet TN office Monday through Friday; this is a full-time in-office position.
  • Deep understanding of heavy civil construction methods including:
  • Earthwork mass grading rock excavation
  • Stormwater sanitary and waterline utilities
  • Bridge foundations substructure & superstructure.
  • Asphalt paving stabilization and surfacing
  • Traffic control planning and phasing
  • Demonstrated experience supporting both Alternative Delivery (Design-Build Progressive DB CM/GC) and traditional DBB projects.
  • Expert proficiency in Primavera P6 including resource and cost loading logic creation and critical path analysis.
  • Knowledge of DOT/FHWA specifications milestones incentive/disincentive structures and schedule compliance requirements.
  • Ability to read and interpret civil drawings cross-sections profiles MOT plans and geotechnical reports.
  • Strong analytical organizational and communication skills; able to collaborate with field teams and design partners.
  • Ability to manage multiple schedules and priorities while maintaining high-quality deliverables.
  • Proficiency with Microsoft Office Suite (Excel Word PowerPoint Projects); familiarity with model-based scheduling or collaborative design tools is a plus.

Education and Experience

  • Bachelors degree in Construction Management Civil Engineering or related field preferred; equivalent experience considered.
  • 3-5 years of CPM scheduling experience in heavy civil construction.
  • Experience with both Alternative Delivery and traditional Design-Bid-Build projects strongly preferred.
  • DOT transportation project experience (highways bridges civil infrastructure) highly desirable.
  • Experience preparing TIAs delay analyses or claims support preferred.

Physical Requirements

  • Occasional travel to jobsites design partner offices coordination meetings and company events (5%10%).
  • Ability to walk uneven terrain on active civil construction sites.
  • Extended periods of sitting computer work or design review in an office environment.
  • Flexible schedule allowing for occasional early mornings evening work or weekend responsibilities tied to project deadlines or delivery requirements.

Equal Opportunity Employment

It is the policy of this Company to assure that applicants are employed and that employees are treated during employment without regard to their race color religion national origin age sex disability or veteran status. Such actions shall include employment upgrading demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training including apprenticeship pre-apprenticeship and/or on-the-job training. We encourage current employees and future employees to recruit interested applicants to apply regardless of race color religion national origin age sex disability or veteran status.

We are an Equal Opportunity Employer and a TN Drug-Free Workplace.


Required Experience:

Manager


About Company

Company Logo

Jones Bros is a full-service heavy highway and civil contractor that supports its customers through aggregates, asphalt paving, bridges & structures, and more.

View Profile View Profile